Brega plans to establish a warehouse in Tripoli
Within the plans of the Brega Oil Marketing Company to advance the Tripoli Oil Depot, its lost storage capacity as a result of the damage it sustained and as a radical solution to the problem of fuel bottlenecks inside the capital, Greater Tripoli and its suburbs, and after a series of meetings that the company’s senior management fought with all parties, to put the stakeholders in a picture The company suffers and the desired results of establishing the project.
With the support of the Attorney General’s office and the National Oil Corporation, the Brega Oil Marketing Company succeeded in issuing a cabinet decision to allocate a plot of land in the municipality of Janzour adjacent to the West Tripoli power station for the establishment of the project. The decision came at the request of the Brega Oil Marketing Company after the company explained to the higher authorities in the country The Office of the Attorney General and the National Oil Corporation The importance of the project and the extent of the suffering that the company is currently experiencing in light of its loss of storage capacities and the poor technical condition of the network of supply lines linking Tripoli oil depot and Zawiya depot on the one hand and Al-Hani depot and Al Shaab port on the other, where Engineer Ibrahim Abu Breda, head of the company’s management committee, held a meeting in a hall at the company’s headquarters on the airport road, Tripoli, which was called by Mr. The aforementioned, which will establish a marine receiving point for all petroleum products and the establishment of tanks to store diesel fuel, gasoline, and other fuels Heavy fuel, kerosene and aviation fuel are supplied, in addition to liquefied gas storage tanks “cooking gas” and the installation of a rotary gas with a production capacity of (30,000) cylinders per normal operating day, whose capacity increases according to the growing demand.
Where the idea of the project that the company will start implementing revolves around covering the needs and requirements of the greater Tripoli region, whose needs represent about “48”% of the total requirements of the western and southern regions (Tripoli – Sebha – Misurata – Zawiya) and equal to about “34”% of The total requirements of the country in terms of the daily need for fuel, where the audience listened to light presentations and detailed explanations on the implementation stages of the project and the desired results behind it, which will, God willing, secure the requirements of the Greater Tripoli and its suburbs, in addition to providing strategic reserves and working to secure the needs of the West Power Station. Tripoli of fuel and to ensure the smooth continuation of electric power generation.
The attendees discussed the study of the environmental impact and the extent of its impact on the area, and the concerned parties obtained assurances from the company’s specialists and technicians that the project would be in accordance with the latest methods and safety requirements. The need to provide and enhance balances from alternative warehouses and the attendant technical, operational and financial difficulties will be dispensed with. It will also work to get the company out of exploiting the commercial sea berths, which is a violation of the berths law, which the company resorted to compelled amid precautionary measures after losing its storage capacities